I some how was motivated enough after driving to Reisterstown to pick up the Jeep to finish the master bedroom door way. Here’s a picture:

I have to pick up the shower pan and shower parts from Fergusson today so that’s why I had to get the Jeep. I only put in an hour or so at the house last night, but I was able to get a few pictures of some stuff we did on Sunday. My Mom and Dad are coming down tonight to help me with light placement and probably stand around and BS for an hour or two before having some Resurrections.
Anyway, here are some more pictures.
HVAC chase downstairs in the living room. This will sort of serve as a seperation between the living room and the dining area since the first floor is mostly open space.
Back bedroom doorway:
Doorway to upstairs bathroom:


Master closet. You can see the ductwork from downstairs continuing up and into the ceiling. This picture makes the closet look small but in person its actually pretty deep. I need to decide on some doors for it so that I can finish framing the opening.

Looking out the the master bedroom door and at edge of closet:

Hopefully be able to get my framing inspected soon…
Should be more updates to follow.



Upstairs plumbing in living/dining room ceiling…will need to build a bulkhead here.


Whirlpool tub roughly in place:
Sanitary in the basement:








Whole kitchen:
From the back windows:

